05.11.2020 |
6th Symposium on the renovation of Engineering structures, VDEI |
Schippke: |
Recalculation and reality - How to deal with the assessment of movable bridges |
|
|
|
|
05.03.2020 |
6th Symposium Railway bridges and constructive engineering |
Kögel: |
Movable bridges at Deutsche Bahn |
|
|
|
|
25.01.2016 |
New Year receipt chamber of engineers Lower Saxony, Hanover |
Leue: |
Numerical investigation of an sea lock-sliding gate in case of a ship impact |
|
|
|
|
30.09.2008 |
BDB-Hanover, Hanover |
Schippke: |
Shanghai, excursion report |
|
|
|
|
|
|
|
|
17.09.2008 |
Department WSV Verkehrstechniken, Koblenz |
Schippke: |
Movable bridges – actually experience in construction and operating |
|
|
|
|
|
|
|
|
12.02.2008 |
5th steel construction for hydraulic engineering-seminar 2008 |
Schippke: |
Glass swing bridge at the harbour in Bremen and additionally some other movable bridges |
|
|
|
|
|
|
|
|
18.01.2008 |
BDB-Nienburg, Nienburg |
Schippke: |
Peking and its Olympic constructions |
|
|
|
|
|
|
|
|
27.11.2007 |
BDB-Hanover, Hanover |
Schippke: |
Sankt Petersburg, excursion report |
|
|
|
|
|
|
|
|
07.11.2007 |
HIMA Hydro Safety Day 2007, Cologne |
Schippke: |
Eric-Warburg-Bridge, technical components |
|
|
|
|
|
|
|
|
27.11.2006 |
BDB-Hanover, Hanover |
Schippke: |
Peking excursion report |
|
|
|
|
|
|
|
|
10.10.2006 |
Hanse city of Lübeck, Lübeck |
Schippke: |
Eric-Warburg-Bridge, technical components |
|
|
|
|
|
|
|
|
29.09.2006 |
Contelos Engineering GmbH, Gehrden |
Schippke: |
Movable steel structures at the interface between steel- and mechanical engineering |
|
|
|
|
|
|
|
|
18.01.2006 |
Geodetic Institute, University of Hanover |
Schippke: |
Serviceability of movable bridges |
|
|
|
|
|
|
|
|
14.01.2005 |
BDB-Nienburg, Nienburg |
Schippke: |
Engineers are making theatre |
|
|
|
|
|
|
|
|
28.09.2004 |
BDB-Hanover, Hanover |
Schippke: |
Movable bridges |
|
|
|
|
|
|
|
|
27.09.2004 |
BDB-Hanover, Hanover |
Schippke: |
Theatre constructions |
|
|
|
|
|
|
|
|
08.09.2004 |
Street bridges, engineering art in Germany, Hanover |
Schippke: |
Clap, lift and turn – movable bridges |
|
|
|
|
|
|
|
|
25.02.2004 |
VSVI-Lower Saxony, Brunswick |
Schippke: |
ZTV- movable bridges |
|
|
|
|
|
|
|
|
10.02.2004 |
AIV-Hanover, Hanover |
Schippke: |
Movable constructions, movable bridges, engineering tasks at the interface between steel and mechanical engineering |
|
|
|
|
|
|
|
|
29.01.2004 |
SVI-Schleswig-Holstein, Rendsburg |
Schippke: |
Movable bridges, experience in design and construction, outlook |
|
|
|
|
|
|
|
|
28.02.2003 |
Academy of construction Biberach, Wien |
Schippke: |
Movable bridges, experience report and an outlook |
|
|
|
|
|
|
|
|
21.02.2003 |
Academy of construction Biberach, Neu-Ulm |
Schippke: |
Movable bridges, experience report and an outlook |
|
|
|
|
|
|
|
|
10.04.2002 |
Neuhoff-Fricke-Donation, Nienburg |
Schippke: |
The effort of building bridges |
|
|
|
|
|
|
|
|
15.01.2000 |
BDB-Nienburg, Nienburg |
Schippke: |
Pedestrian and bicycle bridge across the Weser in Nienburg, design and structure |
|
|
|
|