Logo

DR. SCHIPPKE + PARTNER mbB

Consulting Engineers in Structural,
Mechanical and Electrical Engineering

  • Deutsch
  • Englisch
  • HOME
  • PROFILE
    • MEASUREMENT EQUIPMENT
    • STORED PROGRAM CONTROL (SPC)
    • RESEARCH AND DEVELOPMENT
    • PUBLICATIONS
    • PRESENTATIONS
    • PRESS REVIEW
  • SERVICE
    • MOVABLE BRIDGES
    • BRIDGES (PERMANENT)
    • STEEL CONSTRUCTION FOR HYDRAULIC ENGINEERING
    • OFFSHORE
    • CRANES, HOISTING DEVICES
    • STACKER AND RECLAIMER
    • DOUBLE-COMPOSITE BEAM
    • EXTRAORDINARY CONSTRUCTIONS
  • TEAM
    • FOUNDERS
    • ASSOCIATES
    • STAFF
  • NEWS
    • JOB OFFERS
    • PROJECTS
    • NEWS
    • PRESS REVIEW
  • PROMOTION OF VOCATION
  • CONTACT
  • DATA PROTECTION
    • DATENSCHUTZERKLÄRUNG
    • DATENSCHUTZERKLÄRUNG FÜR BEWERBER
LOGIN
  • MOVABLE BRIDGES

    Ro-Ro-Brücken Cuxhaven

    Auftraggeber: Niedersachsen Ports GmbH & Co. KG 

    2015-2017
    Bestandsaufnahme, Planung und Erstellung der Verdingungsunterlagen für die Bereiche Maschinenbau, Stahlbau/Korrosionsschutz und den Ersatzneubau des Hydraulikaggregates und der EMSR, ab 2017 Prüfung, BÜ/FÜ und Funktionsprüfung

     

    SEE MORE >
  • MOVABLE BRIDGES

    Klappbrücken Flensburg

    Auftraggeber: Activ Marine GmbH

    2016
    Planung der Technischen Ausrüstung (Maschinenbau/Antriebstechnik, Elektro-, Mess-. Steuerungs- und Regelungstechnik (EMSR)), einschließlich Gefahrenanalyse, Objektplanung und Tragwerksplanung

    SEE MORE >
  • MOVABLE BRIDGES

    Klappbrücke Altfriesack

    2014-2017
    Repair and modernization: Inventory, repair and modernization concept, planning planning, tendering, construction supervision and adjustments

    SEE MORE >
  • MOVABLE BRIDGES

    Mahatma-Gandhi-Brücke

    Auftraggeber: Eiffel Deutschland Stahltechnologie GmbH

    2014-2015
    TA Koordinator; Beratungs- und Koordinierungsleistungen, Antriebstechnik, technische Bearbeitung Prüfunterlagen

    SEE MORE >
  • MOVABLE BRIDGES

    Rethe bascule bridge

    2012-2013
    Cooperation at checking the mechanical components 

    SEE MORE >
  • MOVABLE BRIDGES

    Erneuerung Klappbrücke am Schleusenpriel Cuxhaven

    Auftraggeber: Niedersachsen Ports GmbH & Co. KG

    2014-2015
    Planung der Technische Ausrüstung (Maschinenbau, Antriebstechnik, E-MSR), Prüfung der TA, Fertigungsüberwachung der Antriebstechnik, Baubegleitung und Probebetrieb/Funktionstest

    SEE MORE >
  • MOVABLE BRIDGES

    Alternate reconstruction rolling bridge Cranz

    2013-2015

    Planning of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Blue bridge Emden

    2014
    Structural survey and restoration concept of the technical equipment

    SEE MORE >
  • MOVABLE BRIDGES

    Ro-Ro-Rampe Fähranleger Borkum 1

    Auftraggeber: Eisenbahninfrastrukturgesellschaft Aurich-Emden mbH

    2013-2014
    Statischer Nachweis und Konstruktion der Sofortmaßnahme zur Sanierung der Korrosionsschäden und Beratung Bauherr (Seilscheiben, Sanierung)
    Erstellung Kostenschätzung weitere Sanierungsmaßnahmen Borkum 1, 2 und Betonbrückensteg

    SEE MORE >
  • MOVABLE BRIDGES

    Lademaßverbreiterung auf der Bahnstrecke Aurich – Abelitz - Emden

    Auftraggeber: Eisenbahn-Infrastrukturgesellschaft Aurich – Emden mbH

    2012-2015
    Unterstützung der Projektleitung durch ingenieurtechnische Beratung, Projektsteuerung, Überwachung der Terminpläne, Qualitätssicherung

    2009-2011
    Grundlagenermittlung, Vorentwurf, Variantenuntersuchung, Kostenschätzung für die Sanierung/Ertüchtigung bzw. Neubau einer Klappbrücke und der Eisenbahnbrücke Suurhusen

     

    SEE MORE >
  • MOVABLE BRIDGES

    New building railway bridge Kattwyk Hamburg

    2010-2015

    Project control for the branches movable bridge including steel construction, technical components (mechanical- and drive-engineering, process measuring and control technology) and service building

     

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge over the Schlei in Kappeln

    (2010/12/13
    Bridge checking of technical components following RI-EBW-Prüf 

    2012
    Reinstatement works at peak interlock, cooperation on maintenance 

    2007
    Briefing and training of local staff

    2004
    Maintenance)

    Continuing web page:
    Photo chronicle to the Schleibrücke Kappeln von E. Schmidt

    SEE MORE >
  • MOVABLE BRIDGES

    New building bascule bridge Christianshavnskanal and Proviantmagasingraven Copenhagen

    2009-2014

    Design and tendering of the technical components (mechanical-, drive-, electro- and control engineering, electric lighting)

    SEE MORE >
  • MOVABLE BRIDGES

    Belt conveyor Reichwalde

    2010
    Structural Analysis, consulting Siemens

     

  • MOVABLE BRIDGES

    Cäcilien bridge Oldenburg

    2014
    Condition assessment of the technical equipment, creation of a concept for permanent repair, feasibility studies for repair and replacement construction

    2011
    Report on planning concepts for permanent reinstatement works, design and technical components, inspection and replacement of the engine

    SEE MORE >
  • MOVABLE BRIDGES

    Shear bridge over the river Hörn in Kiel (walk and cycle way)

    2013
    Planning and tendering the exchange of pivot bearing 2 and 3, inspection of maintenance works  2013 and constructional supervision for restoration works.

    2012
    Organization and inspection of the maintenance works of technical components, structural analysis of using plastic planks on the movable part of the bridge

    2011
    Investigative report for additional reinstatement works during next years (investment plan)

    2010
    Reinstatement works / Removing the pivot bearing between axis 1 and 2

    2006-2009
    Structural survey, maintenance, restoration, planning of  the reinforcements for durability extension

    1997-1998
    Advice, inspection and object supervision of the steel construction and technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge next to Nesserlander Lock Emden

    2010
    Inspection  of the documents of technical components, mechanical- and hydraulic engineering

    2007-2008
    Rebuilding, design steel construction and technical components

     

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge above the Trave as part of the Northern tangent in Lübbeck (Structure 217, Eric-Warburg bridge)

    2013
    Cooperation on controlling maintenance, removal of the defects 

    1996-2009
    Design, tendering, inspection, object- and manufactory supervision of the technical components (mechanical-, electrical engineering, drive technology, process measuring and controlling technology)

    1994-1999
    Design, tendering of  the technical components, investigation of variants for engine and technical components (1994 bascule- and lift bridge), design of the technical components, structural design and cost estimate of technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Harboer Swing bridge in Lübeck (street, train)

    2014
    Restoration: execution planning assembling aid (traverse for floating crane Enak, bracing) for the contractor, counseling of the contractor for the removal, inclusive the calculation of structure and statics

    1998-2004
    Structural survey, design and tendering of the reinstatement works of  the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Hunte lift bridge B212

    2013
    Structural survey, analysis and reclamation concept of the old engine, statement on defects and determination of usability

    SEE MORE >
  • MOVABLE BRIDGES

    Penne bridge Anklam

    2011-2013
    Construction- and manufactory supervision of the technical components (hydraulics, electrical- and mechanical engineering), cooperation during approval

    2008
    Tendering machine technology

    2005
    Tendering, design reinstatement works  and object supervision of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Rebuilding Swing bridge Malchow Lake

    2013
    Inspection all mechanical components

  • MOVABLE BRIDGES

    Bascule bridge Elmshorn

    2013
    Supporting company Eiffel Germany steel technology GmbH
    during initial operation, drive analysis and deficiency statement

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge over the Oste in Geversdorf

    2012
    Inspection of the documents in view of warranty claim during reinstatement works

    2008-2010
    Inspection, safety and health coordination at construction site, object control of the technical components (mechanical- and electrical engineering, drive technology, process measuring and control technology) and corrosion protection during reinstatement works and improvement activities 

    2006-2007
    Design process measuring and control technology, structural engineering at control station

    2000-2001
    Planning, tendering, object supervision of the restoration of tension rod bearing

    SEE MORE >
  • MOVABLE BRIDGES

    Road Bascule bridge over the Ems in Leer (Jann-Berghaus-bridge)

    2012
    Design hydraulic power unit, replacement of the control of the bascule bridge, assembly specification for tenders 

    2007
    Design, process control, process measuring and control technology, tendering

    2003-2006
    Design, tendering, reinstatement work,  object supervision of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Marientor bridge, Duisburg

    2012
    Reinstatement works, design and tendering of the movable joint of carriageway, inspection of technical components, cooperation on construction supervision

    2011
    Design and tendering socketed stanchion, controlling, electro engine and barrier system

    2004-2008
    Report, structural survey, base estimates, reconstruction and replacement of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Movable bridge, Havel Meadows at Werder

    2012
    Feasibility study (possible bridge types, recommendations of structures, cost estimate, planning and time requirement)

    SEE MORE >
  • MOVABLE BRIDGES

    Auxiliary bridge

    2012
    Check of the fatigue durability of the steel construction

  • MOVABLE BRIDGES

    Bascule bridge see lock Leer

    2011
    Optimizing concept for the existing hydraulic system, structural survey

    Optimizing, adjusting of the lowering brake valve and hydraulic cylinder

    Expertise on buckling of the hydraulic cylinder

    SEE MORE >
  • MOVABLE BRIDGES

    Pedestrian bridge Nesse Area

    2010
    Design of the reinstatement works of bridge end stop, evidence, object supervision

    2004
    Object supervision of the technical components, consulting

    SEE MORE >
  • MOVABLE BRIDGES

    Railway Swing bridge across the Hunte at Elsfleth

    2009
    Recalculation, stability and stresses, investigation of ßUIC-values

    2004-2005
    Rebuilding the bridge engine, design, inspection and approvals

    SEE MORE >
  • MOVABLE BRIDGES

    Penne bridge Wolgast (street, train)

    2009
    Reinstatement works of hydraulic components and stored program control

    1996-1997
    Inspection and object supervision of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge Mariensiel

    2007-2009
    Inspection of the structural analysis, technical components and design

    SEE MORE >
  • MOVABLE BRIDGES

    Lindaunis, Kappeln

    2007
    Risk analysis for shipping

    SEE MORE >
  • MOVABLE BRIDGES

    Faldern bridge, Emden

    2014
    Reinstatement works electrical Engineering

    2007
    Maintenance, structural survey

    SEE MORE >
  • MOVABLE BRIDGES

    Schwanentor bridge Duisburg

    Auftraggeber: Wirtschaftsbetriebe Duisburg

    2014-2015
    Ausschreibung des Rückbaus der kompletten E-Technik u. Haustechnik

    2009
    Untersuchungen und Sanierungsvorschläge Hubtürme

    2004-2008
    Bestandsaufnahme, Begutachtung der Technischen Ausrüstung
    Instandsetzung Antriebstechnik, Erneuerung Steuerung, Elektrotechnik, Schrankenanlage

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge over the Ziegelgraben in Stralsund

    2003-2007
    Design and tendering of the technical components (rebuilding) and restoration

                

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge Groningen

    2005
    Planning and design

    SEE MORE >
  • MOVABLE BRIDGES

    Inner harbour Duisburg

    2005
    Rebuilding the engine, design

    SEE MORE >
  • MOVABLE BRIDGES

    Swing bridge at old/new harbor in Bremerhaven(pedestrian- and bicycle bridge)

    2003-2004
    Design of the technical components for mechanical engineering

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge Hove

    2003-2004
    Restoration of the technical components, maintenance, contract and object supervision

    SEE MORE >
  • MOVABLE BRIDGES

    Hase Lift bridge in Meppen

    2003-2004
    Design of technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Road Bascule bridge over the Hunte

    2003
    Preliminary design

    SEE MORE >
  • MOVABLE BRIDGES

    Street Bascule bridge (Baden bridge) at the Harbor of Stralsund

    2002
    Design, inspection, object supervision and approval the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge over the Pinnau in Uetersen (street)

    2001
    Improvement of the technical components, structural survey, design, tendering, object supervision

    SEE MORE >
  • MOVABLE BRIDGES

    Swing bridge (Langen bridge) at Stralsund Harbour (street)

    2001
    Inspection, object supervision of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge in Husum (street)

    1997-2000
    Design, tendering, inspection, object supervision, approval of the technical components, approval of maintenance

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge and damming construction of the Este flood barrier (street)

    1998-1999
    Checking of the technical components

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule bridge over the Eider near Friedrichstadt (street)

    1995-1998
    Overhauling of the technical equipment

    SEE MORE >
  • MOVABLE BRIDGES

    Bascule- and Pedestrian bridge at lock in Woltersdorf (street)

    1996-1997
    Preliminary planning, design and tendering of the total arrangement

    SEE MORE >
  • MOVABLE BRIDGES

    Herren bridge over the Trave in Lübeck (street)

    1996
    Expertise, span analysis up to 80m of the movable double-leaf element

Current projects

Bridges (permanent)

Steel construction for hydraulic engineering

Stacker and reclaimer

Prinzenstraße 8 | D - 30159 Hannover | Tel.: +49 511 28475-0 | Fax: +49 511 28475-99 | hannover@dr-schippke.de

  • CONTACT
  • IMPRINT